• fr
  • en
65M$ for the new convention centre in Saint-Hyacinthe

65M$ for the new convention centre in Saint-Hyacinthe

16.01.28

KANVA + NEUF architect(e)s will have the great opportunity to make this project a reality for Saint-Hyacinthe. 

Watch the story on Radio-Canada
Read the press release in the Courrier de Saint-Hyacinthe

Other news

BOMBARDIER - Led by design

BOMBARDIER - Led by design

25.06.25

NEUF at the Roundtable: Biodiversity and the Built Environment

NEUF at the Roundtable: Biodiversity and the Built Environment

25.06.25

Azad Chichmanian, speaker in Erevan, Armenia

Azad Chichmanian, speaker in Erevan, Armenia

18.10.18

Two projects shortlisted for the Ordre des architectes du Québec Prix d'excellence en architecture

Two projects shortlisted for the Ordre des architectes du Québec Prix d'excellence en architecture

19.03.13

The Solstice project in the Montreal Gazette

The Solstice project in the Montreal Gazette

18.10.16

Montreal
Ottawa
Toronto
info@
neuf
.ca

Follow us

  • Facebook
  • LinkedIn
  • Instagram

Access

  • Client
  • Employee
Privacy | Cookie declaration
© 2025 NEUF architects inc. — Architecture & Design
  • About us
  • Projects
  • Team
  • News
  • Awards
  • Career
  • Contact
Montreal
Ottawa
Toronto
info@
neuf
.ca

Follow us

  • Facebook
  • LinkedIn
  • Instagram

Access

  • Client
  • Employee
Privacy | Cookie declaration
© 2025 NEUF architects inc. — Architecture & Design
  • {{ suggestion.title }}
    {{ suggestion.type }}